AP Draft Due Date
Hello All,
I am working on E1.9.2 on AP Draft. I follow the below step -
1. Created a standard voucher with supplier payinstrument =D. Voucher GL Date and Voucher date is 20/05/2016 and Due Date is 19/06/2016.
2. Created an AP Draft and P1 line is generated for the draft created. Every thing is fine except due date of the draft.
As per my expection Draft Due date should be same as Vouchers' due date for but actual result is P1 document due is showing P1 GL date vide all other date fields are matching with voucher's date like invoice Date, Discount Date.
As per me P1 due date should be same as Voucher Due date which is not the case. . .