Future commit - Item level
Do we have option to enable future commit on item based? i know we have configuration to be enabled in P41001(BP constant). Is this possible to enable the future commit inventory based on items? In E1 or in JDE world?
1
Do we have option to enable future commit on item based? i know we have configuration to be enabled in P41001(BP constant). Is this possible to enable the future commit inventory based on items? In E1 or in JDE world?