Preventive Maintenance Schedule Issue
I have a PM schedule which has a base interval of 4000 with two activities. AU080123/01-02 Activity needs to be maintained every 4000 hours and AU080123/01-03 Activity needs to be maintained 8000 hours.usage rate is 24.
As per the oracle meter calculation i supposed to get a WO today. Not sure what is sticking out the WO to 2019. Please advise
Attached the screenshot.
Thanks in advance
Regards
Vikram.J