How to create a multiorganization material plan
Customer uses MRP and MPS not ASCP.
It has 2 organizations. Organization M1 produces the Finish Good and one of its subassembly is produced from organization M2.
I know you can load planned order demand from M1 into the master demand schedule of the supplying organization, in my case M2. This works. I’ve been able to generate the MRP in M2 for the subassembly (https://docs.oracle.com/cd/A60725_05/html/comnls/us/mrp/schloa01.htm).
The problem is that in M1 I do not see a supply. Is there a way to sync back in M1 the information? Is there a way to load in my M1 plan (MRP) the coming supply from M2? The thing is that it takes several weeks before I get the material from M2 and meanwhile the planner will rerun the M1 MRP which will produce a new set of planned orders for the subinventory.