PBCS Time Distribution Change
Is there a way to change the time distribution once the PBCS application has been created?
We need to switch it to 4-4-5 spreads.
Or do we need to re-create the application?
0
Is there a way to change the time distribution once the PBCS application has been created?
We need to switch it to 4-4-5 spreads.
Or do we need to re-create the application?