stop or change subnet master configuration - impact to systems?
Hello. I have an Exalogic 1/4 rack interconnected with two Exadata 1/4 racks. I am double-checking the subnet manager settings on my IB switches, per MOS note 1682501.1
Seems some of my settings are incorrect.
Will stopping the subnet manager on a non-MASTER exadata leaf to make chagnes switch impact the operations/communication for the rest of my racks? My MASTER is running on one of my Exalogic leaf switches, as it's supposed to be. As long as I don't mess with THAT one, everything else should be pretty much transparent, correct?