forms 12c integrate with 10.1.2.3 osso
Good day, all.
I know from documentation that oracle closed OSSO in OHS 12c.
I have existing OAS 10g installation with forms 10.1.2.3 and we want to upgrade only forms.
Having 2 IDM infrastructures is overkill in my point of view.
Maybe somebody already treaded the same path?
Is it possible?
Thanks, Vlad.