Optimizing the JDE 9.1 servers plan.
Optimizing the JDE 9.1 servers plan.
We have E1 application and batch server shared between PY and PD (example PD E1 server).
PY has 3 environments.
DV pathcode has seperate E1 server.
We are planning install move PY to on DV E1 server.
Please suggest which are the best ways to do this with or without downtime?
our plan:
Copy DV folder stucture on E1 server and rename it to PY910(since software not available)
deactivate all current ocm of PY environments pointing PD E1 server.
Login into JDEplan and run Environment copy (P989400) from DV to PY(pointing to DV E1 Server).