MDS not showing in Demand Schedules
Hello,
I need to specify the 'MDS-16' in Demand Schedules of Production Scheduler (path: Production Scheduler / Names / <plan> / Schedule Options / Scope tab). However the MDS that we created doesn't appear in the LOV.
The setup we have done so far:
- Forecast set with the desired item;
- MDS entry, & generated MDS;
- MPS & launched it;
- MRP & launched it.
Is there any specific step that we are missing?