Change Pipeline DB connection for PCC
Hi,
Is there any way to change the Pipeline Database configurations after installing the PCC.
I already installed the PCC. While Installation I have pointed to a Pipeleine DB.
But Now I want to point to a different pipeline Database from the PCC.
Please help me ..
Regards,
Hanish Balan