G/L date on a batch
How does the system determine the G/L date to use on a batch? Is it different by batch type? I'm focused more on the manufacturing side at the moment (i.e. 0 batch).
Thanks
0
How does the system determine the G/L date to use on a batch? Is it different by batch type? I'm focused more on the manufacturing side at the moment (i.e. 0 batch).
Thanks