Upgrade from 11.1.2.3.500 to 11.1.2.4.001
Hello,
We have a Planning application at 11.1.2.3.500, and Essbase is 11.1.2.3. We want to be compliant with Java 1.8, so I think we need to upgrade to 11.1.2.4.001.
I read another posting where someone was planning about 6 or 8 patches. Maybe he is using more than we are, so what patches do we have to apply?
I want Planning, Workspace, and EAS Console to work with Java 1.8. We do not use many of the newer features.
Thank you, Kevin