setup for process item(s)
I have setup a process that produces 2 co-products.
Process = B1000042755P, stocking type R
Co-Prod = B1000042755, stocking type M
Co-Prod = x1000003053, stocking type M
All ingredients have a standard cost...
When I run simulated cost rollup for the process I get a simulated cost, when I run it for the co-products I get no data selected.
Is there a problem with my setup? when I run cost rollup, should I run it for the process or for the co-products?