How do opm calculate cost by step?
Hi,
I got the topic about how to setup opm to calculate cost by yield step. Example, own formula have 3 product, 1 ingredient. And there are 3 steps in own routing. By the way, product#1 was yield when step#1 completed and later product#2, #3 were yield when step#3 completed.
How to Product#1 get only the resource cost of step#1? How to Product#2, #3 get the resource cost of all steps?
Regards,
Phanu Phasitanon