JDE E1 to VCP Production scheduling integration
Good morning
I would like to know from the group if anyone has implemented or knows of a case where JDE E1 is integrated with VCP Production schedule. The high level requirements which the client has includes Constraints based scheduling and flexible scheduling tool which will be able to handle schedule changes based on certain criteria.
I am almost certain that native JDE E1 does not offer these capabilities, but just wanted to check from this group if
a). this can be achieved using native JDE functionality
b). If not will VCP Production schedule integrate seamlessly with JDE E1 for providing this solution.