Assign operation sequence going up

edited Nov 24, 2016 4:00AM in Manufacturing - JDE1 (MOSC) 1 commentAnswered

In Work order routing ,Operation sequence is defined in format of xxx.xx (means two places after decimal)

so when i enters routing steps the system automatically assigns an “Oper Seq#” going up by  1 ( eg. 1.00 , 2.00  ,3.00.......10.00........)

Is there any possibility that the system automatically assigns an “Oper Seq#” going up by 0.01 (eg 1.00 , 1.01 , 1.02 , 1.03.......1.99 , .....2.05 .....2.12...) like this.

Kindly help.

Regards,

Himanshu