Assign operation sequence going up
In Work order routing ,Operation sequence is defined in format of xxx.xx (means two places after decimal)
so when i enters routing steps the system automatically assigns an “Oper Seq#” going up by 1 ( eg. 1.00 , 2.00 ,3.00.......10.00........)
Is there any possibility that the system automatically assigns an “Oper Seq#” going up by 0.01 (eg 1.00 , 1.01 , 1.02 , 1.03.......1.99 , .....2.05 .....2.12...) like this.
Kindly help.
Regards,
Himanshu