Migrating AS400 enterprsie server 6 to 7.1 IBM power system
Hi Team,
While migrating enterprise server from Power system 6 to 7.1 what exactly needs to be checked to verify the migration is successful.
if we have document to verify the component of doing the same that would help me to carry out this task.
Please help to verify all parameter that needs to be verify on new AS400 server.
Thanks in advance