Rebuildable process
Hi All,
I am confused with the standard re-buildable process.
Business scenario is as follows,
A truck has tires which needs to be replaced timely.
For tire removal process, we need to track the running hours for each tire
Each tire has a meter virtually defined to capture this running hours.
How the tire meter gets it's readings--(How we have setup).
An engine hour meter is attached to each truck. This meter reading flows to each
tire's meter when the tire is attached to the truck. For each tire, the source meter is set as engine hour meter.
When the tire meter reading hits some level, for an example 1000 hours, the tire should be removed.