Hi,

I'm confused about statement that manufacturing scheduling is being retired in 12.2.5

From WIP and/or EAM it was possible to access the job workbench up to 12.2.4

This was a functionality of manufacturing scheduling in shared mode

That functionality looks like is still there in 12.2.5, and still documented in WIP and EAM user guide but mentioning it's production scheduling

What does it mean exactly ?

Is job workbench from WIP and EAM still supported ?

Do we need to licence production scheduling to use it ?

Or should we replace this functionality fully by production scheduling ?