R12.2.4 - process to switch the DB nodes for EBS application
If we have a DB node that is sync with the primary node and during disaster recovery if we need to switch the nodes.
What all steps are required to make the switch between the nodes -
Is it as simple as mounting the Secondary Node and changing the node setup (under Install in Oracle application) ?
Do we have any documentation to handle this scenario?
Thks