Is there any issue, if single plant MRP (R3482) and Multi plant MRP (R3483) runs at the same time going to use same selection at the same time ?
Also, what is the use of running single plant MRP and multi site MRP at the same time ?
If we can use both together then what is the best recommendation to setup both ?
Please correct me if i am wrong, As multi site MRP can generate all the messages which R3482 generate then what is the use of running\having R3482 along with R3483 ?