Production Scheduling and mix-model scheduling
Can Production Scheduling handle mix-model scheduling? PS is scheduling all like assemblies together but we need the schedule to be mixed so that same model are not scheduled back to back by rule. following youtube video explains what we want PS to do. https://youtu.be/YXZzgMiGVPA
thanks