Apply database PSU with OJVM
Oracle 12.1.0.2.0 Std Ed. 2. No Grid, no RAC, no ASM.
Oracle Linux 6
Working out exact steps for applying both the database and OJVM PSU 170117.
Looking at doc 1929745.1, in the table under "Summary of Patching Approaches for Database ORACLE_HOMEs", selecting the "Preferred approach - Summary Steps",
- item 3 says to run the db psu but do not run the PSU post-install steps
Then at item 6 (after applying the OJVM PSU) it says
- For 12.1.0.1 or later run "datapatch" post install steps.
- For 11.2 ... run the OJVM PSU post install steps followed by the DB PSU post install steps.
Since, for 12.1, the database 'post-install' is to also run datapatch, I getting from the above that running it once suffices for both.