PM Association for a meter based schedule
Hello,
Is PM Associations possible for a meter based schedule?
Consider there are two meter based schedules, scheduled at 120,000 and 240,000 meter reading. 120,000 schedule is associated with the 240,000 one.
Case 1: Meter reading reached 121000 and it generated WO for the first schedule
Case 2: Another reading of 130000 gets added up and it generates a work order for the first and second schedule.
Even if the first schedule is associated with second one, there is no perfect match on the meter reading to get it associated.
How can I handle such scenarios?
Looking forward for a reply.
Thanks in advance.