ASCP Sourcing Rules and Shipping Methods
Hello,
I'm using R12.1.3 ASCP with separate ERP (source) and planning (destination) instances.
I've setup a supplier delivery calendar as described in note 730061.1 and in ASCP I can create a new sourcing rule and assign the shipping method so the setup is working.
My issue is with the maintenance and the setup required going forward, here are the main points:-
1. In source, the sourcing rules and assignment set already exists.
2. In source, the shipping method cannot be assigned to the sourcing rule, it can only be assigned to a new sourcing rule in Destination. I cannot add the shipping method to data collected sourcing rules.