Upgrade Apps 12.0.6 to 12.1.1
Hello all,
I am doing an update of Oracle E-Business Suite 12.0.6 to 12.1.1, I am applying the patches 7303030 and 7303031 however it takes too long for its application, approximately 32 hours the first and the other 14 hours, I have the following parameters in the init.
The server features are:
16GB RAM
8 vCPUs
It should be mentioned that I apply them with 16 workers
db_name = QAPF
control_files = /d02/oracle/QAPF/data/cntrl01.dbf,/d04/oracle/QAPF/data/cntrl02.dbf,/d01/oracle/QAPF/data/cntrl03.dbf
db_block_size = 8192
compatible = 11.2.0
_system_trig_enabled = false
o7_dictionary_accessibility = FALSE #MP
local_listener = QAPF_LOCAL
#nls_language = american