Temporary Allocation of Fixed Asset GL Coding
All,
Is it possible to update the assignment coding of an Asset, without moving the historic balance?
Wile the asset is in a different physical state, we would like it to be costed to a different GL string that it was original set up against. Whent eh Asset reverted we would move the coding back.
We would then have an accurate display of the Asset cost displayed in a to - from format.
Asset Transfer moves the balance rather than allowing us to cost from a certain point of time.