None of the material requirements for the selected components could be allocated. Please re-query.
Hi,
Issue while performing Component Pick Release Form:
I have created a job with assembly item having 2non-serialized input items(Push type) with serial allocation set as predefined for the assembly item in Master Itemns Form an Serial Operation checkbox enabled in WIP Parameters. I have released the job with preallocated serials with 2inputs items having enough onhand quantity.
When trying to perform component pick release, its throwing an error 'None of the material requirements for the selected components could be allocated. Please re-query.' though we have enough onhand.
Is anyone experienced the similar issue before?