Rates from P1301 in F31122
Hi
How Can I set for getting rates from F1301 in P311221 when I have standard cost and the work center rates are different from equipment?
I cost the item with R30835 in 07 with $250000 in F30008 but I need to take $100000 from the equipment.
Thanks Beatriz