MRP - WO Supply Qty
Can MRP be configured to use the latest Qty Shipped recorded in WO Routing (F3112) rather than the header qty as supply? We have several control point steps in the routing to weigh the qty and record them in WO Time Transaction (F31122) as Type 4 - Qty Complete for the operation. Often time, the qty is less than WO header qty due to loss throughout the production process but MRP still considers the header qty as available supply when in actuality we will be closing the order short. Currently, the only way to find out is after the WO