Repository Migration in Siebel IP2016 with Workspace enabled
Hi Team,
We have enable "Workspace" in IP 2016 and have some doubts on Repository Migration from Dev to Test region:
- Can we use Database configuration wizard--> Migrate Repository utility to migrate repository from Dev region to test region. (Without flattening the workspace in Dev)
- If yes, Do we need to enable Workspace in the test environment as well?
- If No, Is flattening mandatory to do repository migration, or if there is any other way?
Thanks for your help in advance.
Regards,
Suraj