MRP does not calculate component items in the BOM
Hi Everyone,
I need your help about material planning. I firstly run MRP for parent item an it is successfull. When I run MRP for component items, R3482 report it says "generation successful". But does not generate any messages on P3411. I have zero on-hand quantity, I correctly set up item branch, BOM and routing data. I also ran BOM structure report (R30601) and Lead time roll up (R30822A) reports.
Tell me if I am missing a point.
Thanks