Method 11 in forecasting
Hi,
I am a little bit confused about the alpha calculation in method 11.
In the document 631350.1 it says that alpha is calculated by a formula 2/(N+2)
In 9.2 forecasting documentation there is no mention of this formula and the examples shown in the documentation it uses alpha= 01 to 0.4.
Which one shall I consider?
Thanks