JDE 9.1 Product Costing
We are running R30802 - Cost roll and simulation. We have loaded some X.. costs, and when we run the simulation, it changes the value of the X4 cost? Is it supposed to do this? How can we stop it from doing this?
0
We are running R30802 - Cost roll and simulation. We have loaded some X.. costs, and when we run the simulation, it changes the value of the X4 cost? Is it supposed to do this? How can we stop it from doing this?