Process costing

edited Mar 16, 2018 5:01AM in Manufacturing - JDE1 (MOSC) 1 commentAnswered

Hi,

I have followed the doc 1592230.1 for process costing.

I have one ingredient. op 10

I have 4 Co-products and the Feat% 45%, 30%, 12% and 13% op 10

the output quantity is the same as the Feat%.

the resource % is the same as the feat %

all 4 co-products are planned 100% and cost 100% from one process

when I do the cost roll-up all the Co-products have the same cost? I wonder why.

All ACQ are =1

Thanks