Control Payables Periods not follow GL calendar
I am performing the setup on Payables.
When I open the Control Payables Periods form, I found the periods are up to 2012.
However, the periods are up to 2020 when I checked from GL for that ledger.
Are some steps I missed in the setup such that Payables periods are not in sync with the GL calendar setup?
Regards,
Christine