ATP Not Considering Cumulative Total Lead Time of Standard Make Item (Doc ID 2181493.1)

edited May 21, 2018 5:01AM in Value Chain Planning - EBS (MOSC) 1 commentAnswered

So Basically this note indicates that Oracle ATP  requires that infinite Supply Time Fence be set as Cumulative Total, the system is not going to look at the Assemblies Cumulative Total or Go through the Bill of Material if you do not set the Cumulative Total at the Inventory Org Parameter. Why this redundant setup?