Supply and demand for co-products
Hi,
I have a situation where two mfg modes take place.
Process manufacturing followed by discrete manufacturing.
The discrete mfg pull on the co-product.
I run MPS/MRP in discrete mode that will generate messages for the Co-Products.
Then I run MRP in Process mode that is based on the Co-products messages and create messages for process WO based on the pacing item.
However when the process mode is ran, the messages of the co-products disappear all what I see is the process item WO.
in the pegging file I see only the pacing item as input to the process item.