Tools Release Downgrade Concerns from 9.1.4.7 to 9.1.3.4
Hello Team,
We have recently performed Tools Release upgrade from 9.1.3.4 to 9.1.4.7.
As a required component we have applied below ESUs along with ASI TL914001.
JDE E1 9.1 Planner ESU | JM21656 |
JDE E1 9.1 Tools Application Enhancement ESU for Tools 9.1.4 | JM18666 |
JDE E1 9.1 Tools Application Enhancement ESU for Tools 9.1.4 Dependency | JM12875 |
Now, even after successful testing in all non-production environment, client want to downgrade tools release back to its original tools that is 9.1.3.4.
My question here is do we need to roll back Application Enhancement ESUs along with Planner ESU?
Do we need to consider any other aspects during downgrade?