forecasting
Hi,
In some methods where the hold out period is not specified in the PO like methods ( 01-03-12) what is the period that the system uses to determine the POA?
I tried with method 01 alone by changing the actual data in the process tab (6), by changing it to 3-6-12
The forecasts quantities are all the same for all the actual periods except that the PDF output gives a POA different every time.
Is there any documentation on this?
Document 631350.1 does not specify the treatment in this case.
Thanks for your help.