How is PM Planned Date calculated when the R12807 is run?
When the R12807 is run it is calculating a field called Planned Date in the PM Backlog. How is this field being calculated?
0
When the R12807 is run it is calculating a field called Planned Date in the PM Backlog. How is this field being calculated?