When batch is closed , should all remain value in WIP go to Close variance.
Will there be a scenario after a batch is closed , batch should still have a WIP value. If so what would these scenarios be (except bug in a system)
Sample scenario:
Batch is closed in current open period and has two products , all WIP Value could be accumulated in same period or from prior closed periods.
Left over WIP Value before Closing batch and after Product line 2 was Yielded ($20000 ), Total WIP ($100,000)
1) Product line 1 (CAF =0 , Actual Quantity =0)
2) Product line 2 (CAF =.8 Actual Quantity =100)