Items Serialized at Sister Plant, Best Practice?
Our company has manufacturing locations and locations that mostly do distribution. What is the best practice for the SRCE (Lot Process) when:
Location A manufactures Item B with SRCE = 6 on F4102
Location A transfers the material to Location Z using SK/OK or ST/OT. What should SRCE = at this location?