11gR2: network interconnect switch move
Hello,
We currently have production servers running 11gR2 RAC (11.2.0.4) on Linux servers (5.9). The RAC is 2 node and has the following interconnect defined.
Node 1
oracle:+ASM1@bba353 /oracle > oifcfg getif
eth0 10.0.60.0 global public
eth1 10.0.61.0 global cluster_interconnect
Node 2
oifcfg getif
eth0 10.0.60.0 global public
eth1 10.0.61.0 global cluster_interconnect
Our network admin wants to move to new switch and he think he can move to eth2 and eth3. Can we move 1 eth at a time and avoid downtime. Or should we shutdown the database and clusterware and then make a move ? If there are any documents , please point us to correct docs to enable this move