Requirement on Preventive maintenance
We have a total of 7 Rotors. There are 4 rotors labelled R4, R5, R6 and R7 in the 2 boxes -BOXA and BOXB. The other 2 are on the top left corner labelled 1 and 2 in the HE box . The 7th one is in the Stores yard. (We can keep the 7th Rotor aside for the moment)
Currently, these assets are not defined in eAM.
Each rotor in the box BOXA and BOXB should run on a 22 week PM cycle of a Minor and Major Overhaul. @Every 11 weeks two rotors will go out of the box to go for servicing to HE (Top left box), and at the same time 2 will return from HE into the BOXA/ BOXB box, replacing the rotors that exited.