F3102
Hi,
We are using standard cost 07 for production items with some components evaluated at actual cost 02 (CLEV=3).
when I attach the BOM to the WO I don't see in F3102 the actual cost components.
Is this normal?
R31802A allows the mix mode costing (never used it before). The AAI's are being built, but I want to make sure that we are on the right track.
Would these items appear in F3102 only after running the R31802A?
Is there any documentation on this mix mode costing?
Thanks