We are creating Projects of Type = capital. We want to have Funds Check functionality at Project Lev
I followed note : Budgetary Control And Funds Check in Projects R12: A Case Study Using a Non-Integrated Budget (Doc ID 1314706.1)
but while checking the fund check system is also looking for the funds at the GL level and it results in fund check failure.