P4210 - Override Preference Schedule
P4210 - Can the "Override Preference Schedule" Processing Option be overwritten by a preference with an advanced preference type = 02(Order Detail Defaults)? We use this preference already to overwrite the price adjustment schedule and that works fine. We would like to know if there is a possibility to set the "Override Preference Schedule" via the preferences (or other options). We would like to use one P4210 Version and based on the Header branch for instance, assign the branch related Preference Schedule.