Lot cost process in Final Mode
Hi Team,
How can we run the Lot Cost Process in "Final" mode if different production batches are in different status at the end of the period.
e.g. There are 100 production batches in the month of Nov-18 (01-Nov-2018 to 30-Nov-2018), including WIP batches continuing from the prior periods and new batches created in Nov-18.
30 batches - products declared, quality inspection completed and closed - Eligible for final close
25 batches - products declared, quality inspection in progress; completed on 30-Nov-18 for the purpose of lot costing as on 30-Nov-18 and will be reverted to 'WIP" after lot cost process
25 batches - WIP batches; products partially declared.