Is there any way to link between SO and PR line for those PRs generated by DRP through pegging?? (in
Hi all,
We have created a form which can used to track all the details of a procurement : starting from Sales Order to GRN for those processed by DRP pegging method.
So as per now we are able to link each stages as follows:
SO -> PO -> GRN
-> PR
Now a new case came like for multiple PR a single PO is created.
As per the current development We are linking SO and PO directly which is causing duplicate line issue as for Single PO Multiple PRs a re Present.
So is there any way to link between SO directly to PR which is generated by DRP Pegging.